Our vacuum-tool report confirms a seal on one flexible stainless cover panel. We receive a stack. I have already learned to count manual preparation on another trial, so this time I want the panel separation and any support during transfer included before calling the handling concept complete.
Ask for the intended stack-to-fixture sequence, including how a second panel or failed separation is detected and handled. Somebody must own those cases, not leave them to the person beside the cell.
The supplier has agreed to review representative stacks and the support arrangement, but has not proposed the single-panel confirmation yet. I have kept that as an explicit gap rather than letting the seal report answer it.