Which UR5e indication belongs with our housing-loading stop?
AmaraArcher0426 · 2025年12月29日 02:50 UTC
20 条回复
Tray present. Taken after the operator replaced the tray, not during the stop.
17分Then label it as the later state. It should not be sent as proof that the tray was present during the stop.
18分And ask what support means by ready. Present can be one input to a larger condition. You could have a readable green lamp and still be answering a question they did not ask, which is a wonderfully efficient way to spend another week exchanging screenshots.
9分What does the actual waiting message say?
14分Await receiving tray ready. The clip does not show the individual input page.
14分Ask support to name the source conditions behind that message for the fitted tray arrangement, then ask your technician whether the retained history covers them at that occurrence. The current page cannot supply their old values.
18分Does support have the actual tray and insert identity? My last ticket had two names for the same fitted part, which made the signal discussion harder than it needed to be.
4分They have the carrier name. The removable insert is missing from our ticket. I'll add its identity.
0分Callum's point is useful. Amara, include the physical label and their drawing name together if those differ. Don't make the remote person recognise the insert from a wide shot of the arm.
8分Can maintenance still retrieve the stop's earlier history?
12分Maintenance preserved the full available range. We don't yet know whether it records the needed source conditions.
13分That is the question for support and controls now. Send the preserved occurrence with the exact fixture mapping; a longer file is useful only if someone can identify what in it answers the wait.
12分Keep the operator's expected next step too. That may expose a missing handover explanation even if the retained signals are insufficient to diagnose the occurrence.
12分Callum, yes, but distinguish what the operator expected from what the system actually requested. I've seen an expectation copied into a sequence report and quietly become an observed event.
10分Operator expected unloading to continue after tray exchange. That is their account, not an event in the trace.
20分Was that expectation in the handover sheet?
3分The sheet says continue after exchange. It does not explain the readiness decision or who confirms it.
18分Then there are two useful questions: explain the captured wait if the evidence allows it, and explain the exchange to the next operator. Don't let an incomplete trace become a reason to leave the second one unanswered.
18分Both questions sent to the applications contact, with the insert identity. Thanks Reece. No stop cause established yet.