Why are loose locating blocks being counted as complete kits now?

OwenAllen0312 · 2025年5月17日 20:31 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

OW
OwenAllen0312
We ordered six tooling kits for a separate UR5e bench, each with a pair of locating blocks and an adapter. The seller's final message lists those contents. Our sealed box contains six blocks and six adapters. They've replied that six means six pieces, without explaining why the adapters somehow escaped that arithmetic.

18 条回复

GR
GraceAllen0320

Show the pair requirement beside the count. Ask for the six missing blocks, not six replacement kits, or the next reply may argue about the wrong quantity.

13分
OW
OwenAllen0312

That's the request I sent. I included the packing photo and the final contents message. Their answer still quotes the invoice quantity without the word kit beside it.

6分
CA
CalebBaker0493

Convenient little crop. Does the packing list call them kits too?

15分
OW
OwenAllen0312

Yes, six tooling kits. The packing list gives no item breakdown. I have sent a full invoice image as well, so there isn't a missing page they need from me.

10分
PR
PriyaBennett0742

Could the second blocks be packed inside the adapters, or have you checked every internal package already?

15分
OW
OwenAllen0312

Every package opened and counted by two of us. The adapters have no cavity large enough to hide a block. I would honestly prefer an embarrassing counting mistake to this exchange.

21分
CA
CalebBaker0493

Been there. Found our missing screws taped under a divider after sending a very confident email. Your blocks sound rather harder to hide.

11分
GR
GraceAllen0320

Ask them to mark the contents message itself with what they say was excluded. It may get you past another reply quoting only the total.

16分
FA
FarahBennett0765

Was that contents message sent before you confirmed the order, Owen? I ask because I would present the sequence explicitly rather than expect a different support person to reconstruct it.

19分
OW
OwenAllen0312

Before confirmation. They answered my question about the pair, then I approved the order against that answer. I've put those messages in order and asked for a single response to the shortage.

12分
CA
CalebBaker0493

I'd ask for the missing parts and freight together. Getting a yes to the blocks followed by a fresh shipping invoice would be a tedious encore.

7分
PR
PriyaBennett0742

It may also be worth asking for a proposed credit, if buying the missing blocks elsewhere would leave you with usable sets

4分
OW
OwenAllen0312

I'd prefer the blocks because we need matched locating faces. A local replacement is possible, but I don't yet have a machining quote or an agreed drawing to compare against.

5分
GR
GraceAllen0320

Then don't name a credit amount yet. Get the replacement cost and compatibility details first, including any inspection you would have to arrange.

4分
FA
FarahBennett0765

I should clarify my earlier question: the message timing makes the agreement easier for their next contact to follow. You can probably leave out quite a few unrelated attachments.

13分
OW
OwenAllen0312

Understood, thanks. Your sequence question helped me cut down the attachment pile. They now acknowledge the pair was stated, but say they need internal approval before offering anything.

19分
CA
CalebBaker0493

At least somebody has read the sentence now.

3分
GR
GraceAllen0320

Have they given you a contact for that approval, or are replies still coming back through the same sales inbox?

21分

讨论已关闭