Our UR5e housing-unloading ticket has a video but no readable message. What should the next shift capture together?
Capture the exact message, active step, occurrence time and identified housing job and fixture, then pair that event with its controller and PLC records; the physical view should show the relevant fixture condition, not only the stopped arm.