Which details should accompany our UR5e housing-unloading stop video?

LuisChan1130 · 14 Oct 2025, 17:06 UTC

Closed
LU
LuisChan1130
Our UR5e housing-unloading ticket has a video but no readable message. What should the next shift capture together?

1 reply

BE
BethBaker0498
Replying to LuisChan1130

Capture the exact message, active step, occurrence time and identified housing job and fixture, then pair that event with its controller and PLC records; the physical view should show the relevant fixture condition, not only the stopped arm.

19 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .