Which bracket measurement am I meant to give the fixture supplier?

LiamChen1186 · 2025年5月17日 12:43 UTC

已关闭
LI
LiamChen1186
I'm buying an FR5 fixture package. Our bracket sheet gives a clamped angle and a different released angle. Which goes on the enquiry?

16 条回复

HA
HassanChan1052

What does the current drawing actually require you to inspect, Liam? I'd want that answered before a supplier picks whichever number makes their proposal look easiest.

16
LI
LiamChen1186

Released assembly angle. The clamped figure is an old process check.

20
KA
KaiBrown0889

Send the drawing requirement. Include the old checks as background, clearly labelled.

17
OM
OmarBrown0926

Our old sheets included checks after a correction operation without saying so. I'd ask whether your released figure was measured before or after any straightening

15
HA
HassanChan1052

And do those two figures belong to the same bracket? I got caught reading a batch summary as if it followed one part through the process.

16
LI
LiamChen1186

Same serial number. Released reading was before correction, according to the inspector.

15
AM
AmyBaker0467

I wouldn't send only the finished drawing and hope they price the awkward bit. Tell them the old process needed correction, with the limits of what you know.

11
KA
KaiBrown0889

That's why I said include the old checks.

18
AM
AmyBaker0467

Fair, I read past that. Your version covers it.

9
HA
HassanChan1052

Who actually did the correction, Liam? The inspector may know when it was measured without knowing what happened on that bench.

21
LI
LiamChen1186

A fabricator who's still here. Asked him to join the supplier call.

7
OM
OmarBrown0926

That helped on ours. The person doing it explained the awkward handling as well as the correction, which was missing from the neat little route description

16
LI
LiamChen1186

He says the gusset fit varied. I hadn't even included fit-up photos in the enquiry.

20
HA
HassanChan1052

Were the gussets all to the same revision? Not claiming that's the cause, just wondering what varied before welding started.

18
LI
LiamChen1186

Revision C throughout that run. Quality is checking the incoming measurements. Thanks, Omar, for the correction question.

7
AM
AmyBaker0467

Leave room for the supplier to say the incoming condition needs work before fixture design. Buying more restraint because it sounds decisive would worry me here.