I handed over our UR5e sleeve-unloading job with a start procedure. Operators now call me for empty pockets and interrupted runs. Looking back, I did not explain those decisions.

5 条回复

HA
HassanBaker0443

What are they supposed to do when a pocket is empty, according to the instructions you actually gave them?

24
JA
JamieArcher0382

There is no instruction for that case. The program waits, and I have been deciding whether to skip or recover it. That knowledge never made it into the handover.

10
HA
HassanBaker0443

Then calling you is the sensible bit of this setup, isn't it? Give them an approved decision path and somewhere to stop when the situation doesn't match it.

13
JA
JamieArcher0382

Agreed. We are reviewing the interruption cases with the integrator and operators, then practising the approved recovery procedures under supervision. I have stopped treating the calls as a training failure.

11
HA
HassanBaker0443

How did the operators get on with the revised instructions, especially the case where they need to stop and ask rather than press on?

8