I handed over our UR5e sleeve-unloading job with a start procedure. Operators now call me for empty pockets and interrupted runs. Looking back, I did not explain those decisions.

5 replies

HA
HassanBaker0443
Replying to JamieArcher0382

What are they supposed to do when a pocket is empty, according to the instructions you actually gave them?

24 points
JA
JamieArcher0382
Replying to HassanBaker0443

There is no instruction for that case. The program waits, and I have been deciding whether to skip or recover it. That knowledge never made it into the handover.

10 points
HA
HassanBaker0443
Replying to JamieArcher0382

Then calling you is the sensible bit of this setup, isn't it? Give them an approved decision path and somewhere to stop when the situation doesn't match it.

13 points
JA
JamieArcher0382
Replying to HassanBaker0443

Agreed. We are reviewing the interruption cases with the integrator and operators, then practising the approved recovery procedures under supervision. I have stopped treating the calls as a training failure.

11 points
HA
HassanBaker0443
Replying to JamieArcher0382

How did the operators get on with the revised instructions, especially the case where they need to stop and ask rather than press on?