who owns the fixture notes after the demo?

TomasGripper_9974d8 · 2026年9月16日 08:18 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

TO
TomasGripper_9974d8
I'm pricing a small handling cell and keep getting a drawing, a robot layout and a very tidy demo video. What I cannot see is who records the little fixture changes once the project starts. Is that normally the integrator, us, or whoever made the fixture? I do not want a useful adjustment living only in somebody's inbox.

5 条回复

GR
GraceAllen0320

Ask for one named owner in the handover. The drawing can point to the fixture, but somebody still needs authority to say which revision is the one people should build from.

0分
NO
NoahBrooks0803

Put the revision on the fixture as well. A folder can be perfect and the wrong plate can still be on the bench.

0分
EL
ElenaCarter1036

I'd separate a change to the drawing from a setup note. If the integrator moves a hard stop during commissioning, who checks whether that changes the part position or just makes loading easier? That boundary is worth agreeing before anyone is under time pressure.

0分
TO
TomasGripper_9974d8

That makes sense. I was treating all changes as paperwork, but a changed stop is obviously part of the process. I will ask for the revision owner and the sign-off route in the quote.

0分
CH
ChloeCarter1005

One more thing for the handover: say how a known fixture revision is restored after a replacement or a controller recovery. A revision number without the location of the approved setup information can still leave the next person rebuilding it from memory.

0分

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 和 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。