简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

One retained completion adds two plates to our shift figure

HarishAbbott0054 · 2025年7月12日 22:20 UTC

已关闭
HA
HarishAbbott0054
I cannot use our FR5 monitor total for planning yet. Reconnecting adds the retained plate completion again, even though the saved job register still identifies the same check. The operator did not request another run.

3 条回复

AN
AnikaBennett0769

Ask the application owner how it matches a completion to the saved job before increasing the total; reconnecting should not invent a second physical plate

4
HA
HarishAbbott0054

They found an unconditional increment on the first successful read after reconnect. The retained job reference is available, but that callback did not use it. A bookkeeping revision is being tested.

8
AN
AnikaBennett0769

Try an unknown reference too, so the revision has somewhere honest to put a completion it cannot match rather than guessing it into the shift figure

12

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .