One retained completion adds two plates to our shift figure

HarishAbbott0054 · 12 Jul 2025, 22:20 UTC

Closed
HA
HarishAbbott0054
I cannot use our FR5 monitor total for planning yet. Reconnecting adds the retained plate completion again, even though the saved job register still identifies the same check. The operator did not request another run.

3 replies

AN
AnikaBennett0769
Replying to HarishAbbott0054

Ask the application owner how it matches a completion to the saved job before increasing the total; reconnecting should not invent a second physical plate

4 points
HA
HarishAbbott0054
Replying to AnikaBennett0769

They found an unconditional increment on the first successful read after reconnect. The retained job reference is available, but that callback did not use it. A bookkeeping revision is being tested.

8 points
AN
AnikaBennett0769
Replying to HarishAbbott0054

Try an unknown reference too, so the revision has somewhere honest to put a completion it cannot match rather than guessing it into the shift figure

12 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .