Which required bearing areas cross the gaps, Mina? A marked section will give packaging something specific to judge.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Which lower-layer revision supports our FR10 turned component cases?
MinaBrown0946 · 2026年4月18日 12:04 UTC
19 条回复
Both loaded ends on the turned outer row; packaging's section uses the earlier lower layer, before tooling widened the withdrawal gaps.
11分That version mismatch is familiar: put both constraints on the same revision before another agreeable meeting produces two incompatible approvals.
15分Has packaging seen the actual widened gaps beneath a filled case? I would establish that before asking them to approve a different pattern.
-3分Keep the packed construction reference with it. Two cases with the same outside dimensions can need different support. The person identifying incoming stock needs a usable distinction too, not just an internal drawing title.
23分Nina's last point belongs in the operator review. A good pattern for one construction is an awkward lesson if dispatch cannot tell which case it applies to.
12分I'd price a straight-row candidate as well. It may lose some count without creating a packaging redesign.
13分Packaging rejected the widened-gap turns after the filled-case review; straight rows preserve support, but tooling has not completed the withdrawal sequence for them.
15分Does the straight option change the normal short-order ending?
10分Include the return to a partial pallet too. Ours looked straightforward until the next order needed the fingers to leave beside a case already there. A complete-layer picture missed that ordinary continuation.
5分Who identifies that returned partial pallet on the covering shift?
19分Simon, yes, and don't turn it into an invented edge case just because the animation starts empty. Mina, does dispatch actually return partial pallets here?
25分Yes, dispatch returns them between small orders; we have added those continuations and the common stopping quantities to the tooling brief.
5分Then the lower count needs a whole-order cost. Extra pallet exchanges might matter more than the slower-looking pattern.
15分Morgan, I would have the covering packer try the proposed identification during that review. Mina still needs a procedure they can actually perform, rather than a planner declaring the pallet obvious.
22分Tooling found a blocked withdrawal on one returned partial arrangement; that continuation is being revised, and the covering packer rejected the first label because it omitted the case construction.
9分Useful that the label was tried now. Have receiving use the same construction distinction so the wrong case does not arrive at dispatch already carrying a plausible job label.
11分Receiving and dispatch now share the construction reference; the revised partial-pallet route is still under review, so no final count or purchase decision.
22分Does the revised route need a temporary case position, Mina, or can it finish within the pallet? That would change the workstation review.
24分