Which lower-layer revision supports our FR10 turned component cases?

MinaBrown0946 · 2026年4月18日 12:04 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

MI
MinaBrown0946
The proposed FR10 pattern turns a component case over lower-layer gaps; I want the actual case support and complete finger route reviewed together before purchasing accepts the count.

19 条回复

NO
NoraBell0670

Which required bearing areas cross the gaps, Mina? A marked section will give packaging something specific to judge.

7分
MI
MinaBrown0946

Both loaded ends on the turned outer row; packaging's section uses the earlier lower layer, before tooling widened the withdrawal gaps.

11分
SO
SofiaChan1065

That version mismatch is familiar: put both constraints on the same revision before another agreeable meeting produces two incompatible approvals.

15分
OW
OwenAli0225

Has packaging seen the actual widened gaps beneath a filled case? I would establish that before asking them to approve a different pattern.

-3分
NI
NinaBrooks0849

Keep the packed construction reference with it. Two cases with the same outside dimensions can need different support. The person identifying incoming stock needs a usable distinction too, not just an internal drawing title.

23分
DA
DavidBennett0780

Nina's last point belongs in the operator review. A good pattern for one construction is an awkward lesson if dispatch cannot tell which case it applies to.

12分
ZA
ZaraBrown0917

I'd price a straight-row candidate as well. It may lose some count without creating a packaging redesign.

13分
MI
MinaBrown0946

Packaging rejected the widened-gap turns after the filled-case review; straight rows preserve support, but tooling has not completed the withdrawal sequence for them.

15分
HA
HazelAli0223

Does the straight option change the normal short-order ending?

10分
SI
Simon_Bowen

Include the return to a partial pallet too. Ours looked straightforward until the next order needed the fingers to leave beside a case already there. A complete-layer picture missed that ordinary continuation.

5分
MO
Morgan_Blair

Who identifies that returned partial pallet on the covering shift?

19分
RE
RebeccaCarter1039

Simon, yes, and don't turn it into an invented edge case just because the animation starts empty. Mina, does dispatch actually return partial pallets here?

25分
MI
MinaBrown0946

Yes, dispatch returns them between small orders; we have added those continuations and the common stopping quantities to the tooling brief.

5分
ZA
ZaraBrown0917

Then the lower count needs a whole-order cost. Extra pallet exchanges might matter more than the slower-looking pattern.

15分
DA
DavidBennett0780

Morgan, I would have the covering packer try the proposed identification during that review. Mina still needs a procedure they can actually perform, rather than a planner declaring the pallet obvious.

22分
MI
MinaBrown0946

Tooling found a blocked withdrawal on one returned partial arrangement; that continuation is being revised, and the covering packer rejected the first label because it omitted the case construction.

9分
NI
NinaBrooks0849

Useful that the label was tried now. Have receiving use the same construction distinction so the wrong case does not arrive at dispatch already carrying a plausible job label.

11分
MI
MinaBrown0946

Receiving and dispatch now share the construction reference; the revised partial-pallet route is still under review, so no final count or purchase decision.

22分
NO
NoraBell0670

Does the revised route need a temporary case position, Mina, or can it finish within the pallet? That would change the workstation review.