Which required bearing areas cross the gaps, Mina? A marked section will give packaging something specific to judge.
Which lower-layer revision supports our FR10 turned component cases?
MinaBrown0946 · 18 Apr 2026, 12:04 UTC
19 replies
Both loaded ends on the turned outer row; packaging's section uses the earlier lower layer, before tooling widened the withdrawal gaps.
11 pointsThat version mismatch is familiar: put both constraints on the same revision before another agreeable meeting produces two incompatible approvals.
15 pointsHas packaging seen the actual widened gaps beneath a filled case? I would establish that before asking them to approve a different pattern.
-3 pointsKeep the packed construction reference with it. Two cases with the same outside dimensions can need different support. The person identifying incoming stock needs a usable distinction too, not just an internal drawing title.
23 pointsNina's last point belongs in the operator review. A good pattern for one construction is an awkward lesson if dispatch cannot tell which case it applies to.
12 pointsI'd price a straight-row candidate as well. It may lose some count without creating a packaging redesign.
13 pointsPackaging rejected the widened-gap turns after the filled-case review; straight rows preserve support, but tooling has not completed the withdrawal sequence for them.
15 pointsDoes the straight option change the normal short-order ending?
10 pointsInclude the return to a partial pallet too. Ours looked straightforward until the next order needed the fingers to leave beside a case already there. A complete-layer picture missed that ordinary continuation.
5 pointsWho identifies that returned partial pallet on the covering shift?
19 pointsSimon, yes, and don't turn it into an invented edge case just because the animation starts empty. Mina, does dispatch actually return partial pallets here?
25 pointsYes, dispatch returns them between small orders; we have added those continuations and the common stopping quantities to the tooling brief.
5 pointsThen the lower count needs a whole-order cost. Extra pallet exchanges might matter more than the slower-looking pattern.
15 pointsMorgan, I would have the covering packer try the proposed identification during that review. Mina still needs a procedure they can actually perform, rather than a planner declaring the pallet obvious.
22 pointsTooling found a blocked withdrawal on one returned partial arrangement; that continuation is being revised, and the covering packer rejected the first label because it omitted the case construction.
9 pointsUseful that the label was tried now. Have receiving use the same construction distinction so the wrong case does not arrive at dispatch already carrying a plausible job label.
11 pointsReceiving and dispatch now share the construction reference; the revised partial-pallet route is still under review, so no final count or purchase decision.
22 pointsDoes the revised route need a temporary case position, Mina, or can it finish within the pallet? That would change the workstation review.
24 pointsAdd to the discussion
Welcome to Application Robot
Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.
By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.