I've kept the current manual packing sheet separate from the proposed FR5 layer drawing. Someone has now attached the manual sheet's approval to the robot proposal. The turned cartons are different positions, with support strips over finger gaps. I have returned it for a joint packaging and tooling review.
Our project engineer owns it. Both teams now have the proposed pattern and current carton construction. The manual sheet remains valid for the existing process only.