简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

I cannot choose a bracket fixture from the restrained inspection notes

AdaAllen0303 · 2026年7月26日 08:03 UTC

回复讨论
AD
AdaAllen0303
I'm reviewing the old steel-bracket records for a proposed FR5 welding cell. Alignment is recorded while held, then the assembly fails the drawing after release. How should I untangle fit-up, fixture location and final acceptance before an unexplained correction operation becomes part of our new plan? Records only at this stage.

1 条回复

NA
NathanChen1156

Does each result identify the inspection condition and drawing revision? Ask for those alongside the route through correction. Put incoming fit-up, located condition, first released measurement and final acceptance in separate rows; leave missing evidence blank and identified, rather than treating the final pass as a record of all four.

13

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。