I'm reviewing the old steel-bracket records for a proposed FR5 welding cell. Alignment is recorded while held, then the assembly fails the drawing after release. How should I untangle fit-up, fixture location and final acceptance before an unexplained correction operation becomes part of our new plan? Records only at this stage.
Does each result identify the inspection condition and drawing revision? Ask for those alongside the route through correction. Put incoming fit-up, located condition, first released measurement and final acceptance in separate rows; leave missing evidence blank and identified, rather than treating the final pass as a record of all four.