简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

A polymer-blank approach without the gripper body

JonasBell0633 · 2025年7月27日 01:23 UTC

已关闭
JO
JonasBell0633
During a previous tooling review we found the service connections had been omitted from the outline. This FR10 unloading proposal is missing the entire gripper body and open machine door. I would like a useful initial access check before we pay for detailed layout work around the proposed base.

16 条回复

HA
HazelBrown0919

Ask for a complete provisional tool assembly and the actual door position first. You can reject an obvious collision without pretending you've finished the whole motion review.

18
JO
JonasBell0633

The toolmaker has supplied body, fingers and adapter. Our fitter is checking the open-door stop against the model, because the installed machine does not open as far as the catalogue view.

6
AI
AishaBrooks0866

Then don't let purchasing compare base prices from that catalogue position. I've had a cheap option evaporate as soon as someone measured the actual machine.

23
JO
JonasBell0633

Base pricing is provisional. The measured door position overlaps the proposed tool approach, so the integrator is comparing orientation changes before recommending a location.

22
IS
IsaacBaker0520

If an orientation change moves the tool connections toward the door, include their full outline too. On ours the fingers fitted and the fitting behind them did not, which was rather late entertainment for the toolroom.

19
HA
HazelBrown0919

Could moving the base be another option, if the orientation change alone doesn't work? I'd keep both routes open until the toolmaker explains what can change.

14
JO
JonasBell0633

It could. No alternative base proposed yet; we are first checking the two allowed tool orientations with the complete connection outline included.

14
EM
EmmaBarnes0550

If they do propose a base move, involve the maintainer before choosing it. Our survey found a side cover that had to slide before lifting away, so its service space was larger than the open-cover picture suggested.

8
AI
AishaBrooks0866

Who is paying for the next comparison? Useful to agree now, otherwise two suppliers may both wait for the other to draw it.

6
JO
JonasBell0633

We have agreed a paid layout-review stage with the integrator, using the toolmaker's defined assembly. The deliverable includes approach, withdrawal and the identified machine access requirements.

11
HA
HazelBrown0919

That sounds like a sensible scope. Does it include the held blank in both orientations, not just the empty tool?

6
JO
JonasBell0633

Yes, the blank and its intended contact positions are included. One orientation looks promising in the initial comparison, but the withdrawal and service-access checks are not complete.

19
IS
IsaacBaker0520

Keep that candidate's drawing reference on the result when it comes back. Otherwise the toolmaker may receive a conclusion about a version they have already changed.

17
AI
AishaBrooks0866

And keep promising out of the purchase approval box. It's useful progress, not a final location yet.

21
JO
JonasBell0633

Understood. Our review sheet names the candidate and lists the outstanding checks. The stand supplier is waiting for that review, not treating the initial picture as permission to manufacture.

22
EM
EmmaBarnes0550

Will the setter see the final candidate as well as the maintainer? Fixture changes may need a different route from the service work already identified.

19

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .