简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

fr5 locator helped until the housing tray changed

RaviCarter0998 · 2026年6月24日 06:36 UTC

回复讨论
RA
RaviCarter0998
A few supervised runs improved after the locator. Replacement tray brought another miss. How should I report that limited result?

8 条回复

EM
EmmaChan1072

Report both observations with the tray identities and checked conditions. Improvement on the first tray is real evidence, but it doesn't establish reliable tray exchange or explain the later miss.

23
RA
RaviCarter0998

Both trays retained. I wrote improved initial pickups, then a miss after exchange. No cause assigned.

13
FA
FarahAllen0330

Have tooling compare the two trays against the intended locator interface, rather than decide which one is right only by which appeared to work.

11
RA
RaviCarter0998

Tooling found the replacement tray's locating slot differs. The drawing check is still pending.

12
EM
EmmaChan1072

That is a useful difference to investigate. Does your report distinguish the original limited trial result from this new physical finding?

11
RA
RaviCarter0998

Yes. Drawing check now identifies the replacement as another housing variant. It should not have been supplied to this job.

24
FA
FarahAllen0330

Who is fixing the tray supply identification, and who will verify exchange with the correct variant before the report claims the problem is resolved?

7
RA
RaviCarter0998

Stores separated the variant. Tooling and controls own the return check. Thanks Farah for insisting on the drawing comparison.

10

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。