We're planning planning repeatable welding of bracket assemblies with Fairino FR5 on a steel gusseted bracket assembly in a small steel assemblies factory.
Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release.
I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine.
This is a records review, not live welding adjustment.
What should count as dimensional acceptance after welding?
TobyBrooks0840 · 2026年4月13日 13:17 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
1 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .