We're planning planning repeatable welding of bracket assemblies with Fairino FR5 on a steel gusseted bracket assembly in a small steel assemblies factory.
Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release.
I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine.
This is a records review, not live welding adjustment.
What should count as dimensional acceptance after welding?