The full tool holding the blank, against a survey of the actual open door, through the required movement. Also the setter's fixture-change space; somebody has to live with the layout
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Our FR5 blank reaches the fixture without anything holding it
ChloeBrooks0831 · 2025年12月19日 19:17 UTC
13 条回复
Tooling has two possible adapters. Neither is selected. Should both go into that comparison?
14分Yes, as identified options with their complete assemblies. Don't combine the shorter adapter's envelope with the other option's price and call it one candidate.
20分Does either assembly include hose fittings, Chloe? Those are often left as somebody else's detail.
21分One includes them. The other drawing stops at the gripper body. I've requested the missing arrangement.
13分And the blank at its intended grip depth.
16分The actual door survey can proceed while those options are completed. Otherwise you risk discovering the same missing obstruction twice, once for each nice new tool drawing
11分Have the integrator own that combined comparison. Separate sketches from tooling and the machine surveyor are useful inputs, not two independent approvals.
10分Integrator owns it. Setter has added the fixture-removal route. Open-door survey remains outstanding.
20分Who supplies the adapter if one is chosen? Include its identity in the replacement-tool handover.
19分Still no accepted route, then.
18分Correct, Theo. Toby, tooling supplier for either adapter; the selected assembly would get one controlled parts list.
9分Keep both loaded withdrawal and empty return in the route review when the survey arrives. Reaching the fixture does not show that the released tool can leave it.
13分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .