Replace ready with explicit states. Request received and loading area available need separate meanings, owners and conditions. Keep the safety permission review separate from this ordinary sequence wording.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
ready means two things in our FR5 handover draft
ZaraChen1178 · 2025年8月13日 01:20 UTC
17 条回复
Both teams agree receipt comes first. Neither draft says how the request remains pending while access is unavailable.
14分Add that waiting state to the walkthrough. Identify who retains the request and who can cancel it. Otherwise a clear receipt message still leaves the next action undecided.
22分Walk it on paper. Delay the machine's answer halfway through.
-7分Include the request reference on the paper exchange too. Two identical-looking requests can arrive at different times and still need different answers.
10分Walkthrough found the integrator expecting the CNC to cancel a request that the CNC considered still pending.
0分Who tells the operator that it is still pending? That is the screen they will be staring at while both suppliers explain why their own half is correct.
9分What did the integrator actually mean by cancel? Withdraw this request, or abandon the current part handover altogether?
6分Bruno, no clear operator indication yet. Ben, withdraw the request only, while retaining the unfinished handover.
16分Then give withdrawal an answer too. Sending cancel and assuming it happened recreates your first problem.
11分Ask the teams to include cancellation crossing with an availability response. They need to agree which state follows each order of events before the operator instructions can be written.
6分And don't restart that handover just because the request disappeared. You still need to know what happened to the part.
4分Draft now retains the handover identity through request withdrawal. Crossing responses go to a defined review state.
8分Does review state give the operator an action and a contact, or only another word to read? I would ask someone outside the design meeting to explain it back.
20分Are both teams signing that definition, Zara? A draft from one side won't settle the other side's retained state.
17分The ordinary-state agreement also needs the responsible safety review alongside it. Renaming area available must not turn it into permission to enter or move.
18分Ben, both teams are reviewing it. Bruno, operator wording and escalation remain unfinished. Safety review is scheduled separately; no implementation approval yet.
13分讨论已关闭