The FR10 handover shows a main routine without its dependencies

AlexBrown0907 · 2026年8月22日 06:03 UTC

回复讨论
AL
AlexBrown0907
I need an identifiable running package before improving our fixture-coupon inspection notes. The commissioned FR10 cell has pendant screenshots, but no revisions, called routines, fixture assumptions or ordinary PLC meanings. What structure should I get from the available integrator?

3 条回复

LU
LuisAli0260

Start with the installed program set and revision map, then trace one coupon cycle through each called routine and ordinary interface wait, keeping fixture references and the meaning of each expected condition beside it

15
AL
AlexBrown0907

The integrator supplied an identified export and dependency list. Two called routines were absent from our screenshot folder. We are now checking the ordinary wait descriptions against the installed fixture, so the package is received but the handover is not yet complete.

5
LU
LuisAli0260

Have a maintainer follow that map without you filling the gaps aloud, and record where it stops answering their question before the integrator becomes unavailable

5