The FR10 handover shows a main routine without its dependencies

AlexBrown0907 · 22 Aug 2026, 06:03 UTC

Reply to discussion
AL
AlexBrown0907
I need an identifiable running package before improving our fixture-coupon inspection notes. The commissioned FR10 cell has pendant screenshots, but no revisions, called routines, fixture assumptions or ordinary PLC meanings. What structure should I get from the available integrator?

3 replies

LU
LuisAli0260
Replying to AlexBrown0907

Start with the installed program set and revision map, then trace one coupon cycle through each called routine and ordinary interface wait, keeping fixture references and the meaning of each expected condition beside it

15 points
AL
AlexBrown0907
Replying to LuisAli0260

The integrator supplied an identified export and dependency list. Two called routines were absent from our screenshot folder. We are now checking the ordinary wait descriptions against the installed fixture, so the package is received but the handover is not yet complete.

5 points
LU
LuisAli0260
Replying to AlexBrown0907

Have a maintainer follow that map without you filling the gaps aloud, and record where it stops answering their question before the integrator becomes unavailable

5 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.