简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Cannot justify our FR5 pilot with the fixture hours left blank

Lewis_Bailey · 2025年9月19日 01:28 UTC

已关闭
LE
Lewis_Bailey
My colleague asked what she should stop doing to make time for the FR5 spacer-loading pilot I proposed. I had priced the equipment, but treated her fixture work as an unspecified contribution. That was unfair, and it also made the estimate uninformative. We need a bounded trial question before deciding whether either of us should spend more time on it.

2 条回复

SA
SarahBrooks0850

Our pilot only became comparable once we timed the existing job from preparation through clearing; could you agree that baseline and a staff-time limit together before asking your colleague to design the trial fixture?

10
LE
Lewis_Bailey

Yes, we have agreed to compare one spacer family through the same finished-tray state, with setup and assistance counted on both sides. She will help define the fixture work once a time allowance is agreed. The hardware purchase is still undecided.

12

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .