Our bracket history measures alignment in two different setups

NoraAbbott0061 · 2025年11月26日 19:58 UTC

已关闭
NO
NoraAbbott0061
I have located the released-bracket measurement supports and drawing revision for our UR5e planning review. The restrained checks used a different reference face, so the apparent before-and-after movement still needs explaining.

10 条回复

BR
BrunoChan1061

Ask inspection which readings can be compared after accounting for those references; the old correction time still belongs in the estimate while that remains unanswered.

3
NO
NoraAbbott0061

Inspection says the released result is outside the requirement. It cannot calculate a release movement from the restrained reading as recorded.

18
EL
EllaBarnes0555

Then drop the calculated movement from the summary. Keep the released failure and its measurement method; those are still relevant to the new fixture plan.

14
LI
LinChen1140

Who carried out the old correction work? A short conversation with that person may explain what the notes omit, especially whether they corrected every bracket or only the ones that failed the released check.

18
BR
BrunoChan1061

Lin, worth asking, but I'd mark recollection separately from the inspection readings; the person may remember the worst brackets better than the ordinary ones.

3
NO
NoraAbbott0061

The former fabricator is available. I have asked about the sequence and how correction was selected, not for remembered dimensions.

2
EL
EllaBarnes0555

Did the component revision change within the old batch? That could explain why some needed different treatment, without saying anything about this proposed fixture.

4
NO
NoraAbbott0061

No revision change is recorded in that batch. The fabricator recalls correcting only some brackets, but we have no item-by-item correction list to confirm how many.

7
LI
LinChen1140

That is enough to stop calling it an automatic correction after every weld, but not enough to remove the work. Could the next trial follow identified brackets through the released check and any correction separately?

15
NO
NoraAbbott0061

Yes. Fabrication and inspection have agreed that trial structure, with the current assembly revision and measurement supports specified. Timing remains unbooked, and correction effort stays provisional.

18