简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

UR5e housing-unload ticket needs the event behind the phone clip

ElliotBrooks0857 · 2026年6月26日 12:41 UTC

回复讨论
EL
ElliotBrooks0857
Twenty-four days on our UR5e unloading ticket. Alibaba seller wants more evidence. I need one traceable occurrence, not a diagnosis inferred from the stopped housing.

4 条回复

SA
SarahCarter1024

What does the clip establish about the sequence before the stop? If it begins with the housing already held, it cannot tell support whether the preceding fixture release happened as intended.

16
EL
ElliotBrooks0857

Housing is held when filming starts. Earlier fixture release isn't visible. The saved event gives time and active step.

16
SA
SarahCarter1024

Use those to ask for the relevant retained fixture history, and name what the video cannot show. Also send the installed job revision; the active-step name needs to be interpreted against the job that actually ran.

18
EL
ElliotBrooks0857

Job revision linked. Maintainer recovered the fixture history for that occurrence; support identified a missing release confirmation, but its cause remains unestablished.

22

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。