Twenty-four days on our UR5e unloading ticket. Alibaba seller wants more evidence. I need one traceable occurrence, not a diagnosis inferred from the stopped housing.
What does the clip establish about the sequence before the stop? If it begins with the housing already held, it cannot tell support whether the preceding fixture release happened as intended.
Use those to ask for the relevant retained fixture history, and name what the video cannot show. Also send the installed job revision; the active-step name needs to be interpreted against the job that actually ran.
Job revision linked. Maintainer recovered the fixture history for that occurrence; support identified a missing release confirmation, but its cause remains unestablished.