What should count as dimensional acceptance after welding? (Universal Robots UR5e)
SamAllen0333 · 2026年5月5日 03:33 UTC
We're planning preparing robotic welding of gusseted brackets with Universal Robots UR5e on a gusseted angle-bracket assembly in a small steel assemblies factory. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine.
This is a records review, not live welding adjustment.