Does the inspection procedure define the released condition and reference supports? Check that alongside whether each old measurement says how the assembly was held.
What should count as dimensional acceptance after welding? (Universal Robots UR5e)
SamAllen0333 · 5 May 2026, 03:33 UTC
We're planning preparing robotic welding of gusseted brackets with Universal Robots UR5e on a gusseted angle-bracket assembly in a small steel assemblies factory. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine.
This is a records review, not live welding adjustment.
4 replies
Add to the discussion
Welcome to Application Robot
By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.