Our FR5 arrived with a different fixture-alignment interface

AnnaAllen0329 · 2026年6月29日 02:10 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

AN
AnnaAllen0329
We bought against the seller's confirmed fixture drawing. The delivered FR5 has another suffix and a visibly different alignment adapter. Tooling is unfitted after 26 days of waiting for a comparison. I am keeping an attachment index so we stop answering different drawings, but I still cannot tell what the difference means for our plate-transfer job.

15 条回复

AD
AdaArcher0390

Which drawing does the delivered adapter's own label identify? I'd start there rather than treating the main arm suffix as the explanation for every visible difference

13分
AN
AnnaAllen0329

Its label names a different adapter reference from our final list. The seller has sent the general arm drawing twice. Neither copy identifies the supplied adapter's locating feature.

18分
OW
OwenBarnes0573

Our toolmaker needed the register dimensions, not another outside photograph. Can yours mark those attachment features?

11分
NA
NaomiAli0245

Keep the confirmed adapter as one column and the delivered reference as another. Have each drawing identified and compare the features your tooling relies on. A different reference alone does not tell you whether the interface is compatible.

19分
VI
VictorAllen0272

And get a named technical reply to that comparison, Anna, otherwise the next email will probably contain the arm drawing in a more convenient file format

4分
AN
AnnaAllen0329

The toolmaker marked the locating depth and diameter. The seller's technical contact finally supplied the adapter drawing; it has a shallower locating recess than the confirmed item. We are arranging an independent dimensional check of what arrived.

23分
AD
AdaArcher0390

Would that prevent the tool sitting on its intended face, or is that still for the toolmaker to assess?

17分
AN
AnnaAllen0329

Measured depth agrees with the delivered drawing. Our toolmaker confirms the locating feature would bottom before the mating faces meet. We have not attempted to draw it together with the bolts.

15分
OW
OwenBarnes0573

Then leave it unfitted. Has the seller offered the confirmed adapter rather than machining this one?

11分
NA
NaomiAli0245

That measured mismatch is the decision point. Keep the report tied to the delivered reference; there is no need to turn it into a claim that the whole arm is wrong or unusable.

12分
AN
AnnaAllen0329

Replacement of the adapter agreed, Owen. They confirmed the original reference and a dimensional inspection before dispatch. The arm stays here; we have no reason to return it over this identified tooling mismatch.

8分
VI
VictorAllen0272

Keep the wrong adapter in the return record too, so stores doesn't put it on the shelf as a useful spare because it looks almost identical

18分
AN
AnnaAllen0329

Correct adapter received and checked by our toolmaker. The locating depth now matches the confirmed drawing and permits the intended mating faces to meet. Wrong adapter returned under its own reference. Installation can continue with the normal checks.

15分
AD
AdaArcher0390

Thanks for reporting the actual depth finding. Much clearer than different suffix, problem solved somehow

19分
NA
NaomiAli0245

Your attachment index can now show which comparison closed the supply issue and which assembly is approved for installation. Keep that with the maintenance copy, not just the purchasing correspondence.

6分

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 和 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。