简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

42 matched kits ordered, six locating blocks still in dispute

GraceBell0668 · 2026年7月3日 04:11 UTC

回复讨论
GR
GraceBell0668
Our separate FR5 accessory order should make 42 kits, each with a locating block. The sealed box has 36 blocks. Seller says pieces; invoice and final per-kit message say otherwise. Which comparison should I send?

10 条回复

LE
LeoBarnes0536

Do the remaining contents match forty-two kits, or are other quantities short too?

7
GR
GraceBell0668

The rest matches. We can assemble 36 complete kits with six left waiting for their blocks. I've kept the original packaging and item counts, not just a photo of the shortage.

16
CA
CalebCarter1015

Send that reconciliation beside the final contents message. Ask which agreed kit entry supposedly allows only thirty-six blocks.

16
GR
GraceBell0668

Sent. They accept our physical count but still say the invoice quantity is pieces. I've asked them to address their own message listing a block in each kit rather than repeat the invoice total.

18
TH
TheoAdams0149

Does that final message explicitly cover this order reference and quantity? A clear link would let you identify the conflicting instructions without asking the person reviewing it to infer which conversation belonged to which batch.

1
LE
LeoBarnes0536

Keep acknowledgement of the count separate from agreement that six blocks are owed.

11
GR
GraceBell0668

Theo, yes, exact order reference and 42 kits in that exchange. Leo, quantity received is agreed; the supply obligation remains disputed. Purchasing now has the linked entries together.

8
CA
CalebCarter1015

That is the disagreement to preserve. A sealed outer box doesn't by itself explain where the shortage arose, but neither does calling the quantity pieces answer the agreed contents.

13
GR
GraceBell0668

Seller's order contact has now accepted that six blocks are outstanding and offered standalone supply with carriage included. No date or collection reference yet. Stores remains at 36 complete kits.

17
LE
LeoBarnes0536

Ask for the block reference and supply timing. Agreement on the shortage is not receipt.

8

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。