The extra clamp proposal is based on an inspection tick

NinaCarter1023 · 2025年1月12日 14:05 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

NI
NinaCarter1023
I found our old bracket sheets while preparing the UR5e fixture handover. Every in-fixture check gets a tick, but the released inspection has handwritten angle corrections. Someone has proposed another clamp on the upright. I would like to understand what we measured before buying a more complicated version of the same problem.

12 条回复

SO
SofiaBell0630

What does the tick actually certify? It could mean the component touched the stops, or it could represent a measured dimension, and those lead to quite different discussions about that extra clamp.

11分
NI
NinaCarter1023

The shift lead says it means the upright was against the fence before welding. No angle measured there. I had read the heading as a dimensional check.

19分
SO
SofiaBell0630

Then the old records don't show that the finished assembly was in tolerance while restrained. I'd correct that interpretation in the handover before it becomes the reason everyone quotes for changing the fixture.

13分
TO
TobyArcher0405

Were released angles measured before or after the handwritten corrections?

7分
SO
SofiaBell0630

That ordering matters too, especially if corrected means the part was physically adjusted rather than the measurement entry amended.

13分
NI
NinaCarter1023

We have a first angle and a final angle on some sheets. They did physically straighten those parts. Other sheets only have the final number, which is less useful than I hoped.

5分
SO
SofiaBell0630

Use the paired entries to describe what is known, and flag the others as incomplete. Whoever designs the trial should see that uncertainty rather than an average combining different stages.

15分
EL
ElenaAli0253

Another clamp might change behaviour, but a fit-up tick is a remarkably thin basis for specifying one. Has anybody looked at the incoming bend angles and locator condition? Those belong in the investigation too.

9分
AM
AmaraCarter1035

An average final angle would hide the correction workload anyway, even with perfect arithmetic. Include how many parts needed somebody at the straightening bench.

21分
SO
SofiaBell0630

Yes, and who will own that work if it remains after automation. It shouldn't vanish from the staffing plan just because the welding step gets a robot.

19分
NI
NinaCarter1023

I've removed the claim that the fixture holds finished tolerance. We are asking quality and welding to plan paired measurements and review incoming parts before the fixture order. Nobody has agreed to the extra clamp yet.

19分
SO
SofiaBell0630

Can the same review define a released-part acceptance method that the next shift can follow? That would make the new records considerably more useful than the inherited ticks.

15分