Why restart our FR5 access study from a blank-only sketch?

LuisArcher0434 · 2025年12月29日 02:34 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

LU
LuisArcher0434
We already supplied the complete loaded tool and the setter's marked route for our FR5 brass-blank loading review; the buying update has reverted to a blank-only reach picture and calls the position chosen, although the integrator's route result is still outstanding.

9 条回复

AM
AmaraCarter1035

Correct the buying update and link the actual review inputs, because people will act on the selected status long before they notice the missing gripper.

15分
LU
LuisArcher0434

The buyer used an early supplier image in a newer summary; I've asked for the current complete-tool reference and under-review status to replace it.

11分
AI
AishaBrooks0866

Does that summary authorise spending, Luis, or is it only an internal progress picture? The correction may need to reach someone outside the project team.

10分
LU
LuisArcher0434

It was attached to a request for the stand price, not an order; the supplier has been told the position is not selected and the route assessment remains open.

15分
AM
AmaraCarter1035

Good. Ask the integrator what is actually blocking its result now, rather than sending the whole tool package again as though it had never arrived.

12分
LU
LuisArcher0434

It is checking the empty exit at the handle; the loaded entry is already represented, but no complete route has been accepted.

5分
AI
AishaBrooks0866

Then have the price request state that dependency. A provisional price can be useful without becoming permission to fabricate a stand for an unfinished route.

11分
LU
LuisArcher0434

The revised price request carries that condition and the current drawing references; stand manufacture is not authorised, and we are waiting for the empty-exit result.

16分
AM
AmaraCarter1035

Has that result arrived, Luis, or is purchasing still working with a conditional price?

23分