简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Why restart our FR5 access study from a blank-only sketch?

LuisArcher0434 · 2025年12月29日 02:34 UTC

已关闭
LU
LuisArcher0434
We already supplied the complete loaded tool and the setter's marked route for our FR5 brass-blank loading review; the buying update has reverted to a blank-only reach picture and calls the position chosen, although the integrator's route result is still outstanding.

9 条回复

AM
AmaraCarter1035

Correct the buying update and link the actual review inputs, because people will act on the selected status long before they notice the missing gripper.

15
LU
LuisArcher0434

The buyer used an early supplier image in a newer summary; I've asked for the current complete-tool reference and under-review status to replace it.

11
AI
AishaBrooks0866

Does that summary authorise spending, Luis, or is it only an internal progress picture? The correction may need to reach someone outside the project team.

10
LU
LuisArcher0434

It was attached to a request for the stand price, not an order; the supplier has been told the position is not selected and the route assessment remains open.

15
AM
AmaraCarter1035

Good. Ask the integrator what is actually blocking its result now, rather than sending the whole tool package again as though it had never arrived.

12
LU
LuisArcher0434

It is checking the empty exit at the handle; the loaded entry is already represented, but no complete route has been accepted.

5
AI
AishaBrooks0866

Then have the price request state that dependency. A provisional price can be useful without becoming permission to fabricate a stand for an unfinished route.

11
LU
LuisArcher0434

The revised price request carries that condition and the current drawing references; stand manufacture is not authorised, and we are waiting for the empty-exit result.

16
AM
AmaraCarter1035

Has that result arrived, Luis, or is purchasing still working with a conditional price?

23

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .