I am preparing training for our proposed spacer-blank tending cell. The machine supplier calls a received request ready; the FR5 integrator reads ready as permission for the loading sequence. Same word, different event. I need the two meanings separated before I can explain the screen to a shift.
The FR5 interface calls request receipt ready
OwenBrooks0834 · 2025年9月24日 06:49 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
1 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .