The FR5 interface calls request receipt ready

OwenBrooks0834 · 24 Sept 2025, 06:49 UTC

Closed
OW
OwenBrooks0834
I am preparing training for our proposed spacer-blank tending cell. The machine supplier calls a received request ready; the FR5 integrator reads ready as permission for the loading sequence. Same word, different event. I need the two meanings separated before I can explain the screen to a shift.

1 reply

CL
ClaraAllen0263
Replying to OwenBrooks0834

Give request acknowledgement and loading availability separate definitions, with an owner, set and clear conditions, and timeout and restart behaviour. Have both teams review a sequence table. Ordinary sequence signals must not be described as replacing the cell's safety permissions.