I am preparing training for our proposed spacer-blank tending cell. The machine supplier calls a received request ready; the FR5 integrator reads ready as permission for the loading sequence. Same word, different event. I need the two meanings separated before I can explain the screen to a shift.
The FR5 interface calls request receipt ready
OwenBrooks0834 · 24 Sept 2025, 06:49 UTC
1 reply
Discussion closed
This discussion is closed to new replies after six months without activity. Last activity: .