My FR10 pilot estimate assigned our colleague free fixture work

LeoBaker0449 · 2025年12月9日 18:45 UTC

已关闭
LE
LeoBaker0449
I priced the FR10 and gripper, then left fixture preparation and staff hours blank. My colleague noticed. I want a bounded spacer-unloading study before asking either of us to support a pilot.

8 条回复

KA
KaiAllen0280

Start with the existing spacer job over an agreed order boundary. Then ask the study to price the proposed preparation, release, changeover and staff involvement against that same work, with a decision before pilot spending.

9
LE
LeoBaker0449

We agreed to compare one regular spacer order first. My colleague wants a limit on the hours they can be pulled away from production.

4
FE
FelixBaker0458

Put that limit in the study scope now. A small robot trial can become a large interruption if the fixture designer assumes your colleague is available whenever another sample is needed.

17
LE
LeoBaker0449

A capped allowance is now listed. Fixture designer has asked for sample variation and current release steps before quoting its work.

20
FE
FelixBaker0458

Did the designer get those details, Leo, or is the quote still waiting on your workshop?

21
KA
KaiAllen0280

And keep the current method's interruptions in the baseline too. The comparison should not give either approach a conveniently uninterrupted best few minutes.

10
LE
LeoBaker0449

Details supplied, Felix. The study price includes fixture work and the capped staff allowance. We have not booked the pilot; the whole-order comparison is the next decision point.

12
KA
KaiAllen0280

That is a much better discussion to have with your colleague. They can judge a defined piece of work instead of being asked to absorb whatever the arm price forgot.

14