I've asked for loaded entry and empty withdrawal on our FR5 exchange proposal. The returned view shows the blank at the fixture but no open fingers or door position. What exactly should the combined review contain?

5 条回复

DA
DavidAllen0345

The complete tool and held blank through the intended sequence, with finger opening and the measured door arrangement. Ask who supplies the machine survey and who owns combining it with the tool.

7
RO
RobinBell0686

Machine owner will supply the survey; integrator owns the combined view. The toolmaker already has an open-finger drawing, which was missing from the export.

15
DA
DavidAllen0345

Good. Include fittings and the setter's fixture-change space on that same revision. Separate correct drawings won't reveal a clash between the tool and the work around it.

8
RO
RobinBell0686

The combined view is back. It shows a rear fitting close to the inside door handle. Integrator is reviewing that point; the setter has not accepted access yet.

9
DA
DavidAllen0345

Is the fitting position fixed or one of several proposed arrangements? Keep the alternatives identified if that changes, so an easier route doesn't inherit an assessment for another tool.