How do I compare both directions through our FR5 mill opening?

RobinBell0686 · 1 Dec 2025, 18:39 UTC

Closed
RO
RobinBell0686
I've asked for loaded entry and empty withdrawal on our FR5 exchange proposal. The returned view shows the blank at the fixture but no open fingers or door position. What exactly should the combined review contain?

5 replies

DA
DavidAllen0345
Replying to RobinBell0686

The complete tool and held blank through the intended sequence, with finger opening and the measured door arrangement. Ask who supplies the machine survey and who owns combining it with the tool.

7 points
RO
RobinBell0686
Replying to DavidAllen0345

Machine owner will supply the survey; integrator owns the combined view. The toolmaker already has an open-finger drawing, which was missing from the export.

15 points
DA
DavidAllen0345
Replying to RobinBell0686

Good. Include fittings and the setter's fixture-change space on that same revision. Separate correct drawings won't reveal a clash between the tool and the work around it.

8 points
RO
RobinBell0686
Replying to DavidAllen0345

The combined view is back. It shows a rear fitting close to the inside door handle. Integrator is reviewing that point; the setter has not accepted access yet.

9 points
DA
DavidAllen0345
Replying to RobinBell0686

Is the fitting position fixed or one of several proposed arrangements? Keep the alternatives identified if that changes, so an easier route doesn't inherit an assessment for another tool.

9 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .