简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

What did inspected actually cover on this refurbished FR10?

RobinAli0251 · 2025年9月16日 19:49 UTC

已关闭
RO
RobinAli0251
The refurbished FR10 listing is tempting for our puck-transfer test cell. Inspected is the entire condition report so far. What should I request before paying for collection or arranging our own assessment?

4 条回复

EL
EllaBarnes0555

Get the unit and controller identities, inspection scope and results, service history and included-equipment list first. Then an assessor can identify what still needs checking for your proposed use.

12
RO
RobinAli0251

Seller supplied serial photographs and a cable list. Inspection answer is powers up. No repair history yet. I have not booked collection.

8
EL
EllaBarnes0555

Then price the remaining assessment before treating the asking price as a bargain. Powers up leaves a lot of the proposed handling application unexamined.

20
IS
IsabelChen1170

Include the work needed to make it a supported usable package for your cell, not only the assessor's visit. Missing tooling documentation, setup, transport and training can change the comparison with an apparently dearer offer whose scope is actually defined.

10

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .