简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Vacuum demo avoided the tape seam on every carton

ElenaAli0253 · 2025年2月25日 04:52 UTC

已关闭
EL
ElenaAli0253
I'm reviewing vacuum tooling for a UR5e dispatch transfer. The demo cups land on smooth board, while our normal cartons have a tape seam crossing that area. Why are we discussing cycle speed before trying the surface we'll actually supply?

17 条回复

BR
BrunoChan1061

Send representative closed cartons with the usual tape and contents, and have the supplier show their proposed contact positions on those rather than nudging the seam out of the trial.

18
EL
ElenaAli0253

They're happy to try ours. They asked us to specify one cup location, but the seam wanders between boxes. That is part of the problem.

22
BR
BrunoChan1061

Give them the observed seam range instead of an imaginary fixed position, otherwise the operator ends up straightening cartons to preserve the supplier's nice test result.

20
SA
SamCarter1029

Sample range. Include the rough-board carton as well as the glossy printed one.

10
BR
BrunoChan1061

And identify which samples represent normal supply variation, so one attractive board finish doesn't quietly become the only approved carton.

5
EL
ElenaAli0253

I've pulled examples from three deliveries. One has wrinkled tape but passed our normal packing checks. It is going in the sample group, not being quietly tidied up.

9
BR
BrunoChan1061

Keep its condition recorded, then you can discuss whether the tooling accommodates it or whether packing acceptance needs an explicitly agreed change.

13
HA
HarishBell0663

Who owns rejection when pickup cannot be confirmed? Our old line had a decent vacuum tool and a terrible exception route, so somebody stood beside it rescuing awkward cartons all afternoon. Ask for that case in the proposal.

14
EL
ElenaAli0253

Currently the proposal just says retry. No limit, no rejected-carton route. I've asked for pickup verification, loss-of-grip response and a defined exception process in the supplier's assessment.

21
FA
FarahBrown0939

Can I ask how they plan to assess release into the dispatch lane, as well as pickup?

6
BR
BrunoChan1061

Release belongs in the same assessment, along with the real destination geometry; sticking or dragging a carton after placement is still a handling failure.

6
SA
SamCarter1029

Ask for results by sample type. A single success percentage can hide the awkward board.

6
EL
ElenaAli0253

Supplier reviewed photos and wants to move the contact area away from the seam where possible, then trial all board variants. No claim yet that one location covers the observed range.

17
BR
BrunoChan1061

Have them document any presentation requirement that comes with that choice, because a different contact area may depend on carton position you don't currently control.

4
EL
ElenaAli0253

That requirement is being added. We are also costing the incoming guide arrangement they suggested. The vacuum tool quote alone was not the whole pickup concept, apparently.

14
EL
ElenaAli0253

Trial booked with our packed samples and a representative lane section. I haven't accepted the concept; at least tape wrinkles now appear in the agenda rather than only in our workshop.

20
BR
BrunoChan1061

Include whoever will maintain the cups and guides in the review, so any cleaning and replacement assumptions reach the people doing those jobs.

12

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .