Our 206 kit order contains 197 locating blocks

Marcus_Bowen · 2026年1月25日 21:46 UTC

已关闭
MA
Marcus_Bowen
We unpacked the accessory order for our existing FR5 and counted 197 locating blocks for 206 matched kits. The other contents match. Invoice unit is kit; the final message gives one block per kit. Seller says we have misunderstood pieces. How do I make the nine missing blocks the question it answers?

13 条回复

JA
JamieBarnes0556

Put the agreed block entry beside the receiving count and nine-block difference, with the invoice unit shown; ask for an answer to that shortage rather than invite a new explanation of the whole order

12
MA
Marcus_Bowen

Sent that comparison. Seller has acknowledged the count but says some kits were intended to share blocks. That arrangement appears nowhere in the accepted contents.

20
SA
SamBennett0768

Ask them to point to the accepted shared-block entry, then; otherwise they're describing a different order after yours arrived short.

24
MA
Marcus_Bowen

They cannot identify one and have accepted nine missing blocks. Now offering nine loose replacements with a slightly different reference. I've asked tooling to compare it before agreeing.

6
AD
AdaBennett0738

Don't let getting the quantity right close the suitability question. The replacements still need to make nine usable kits, not just fill nine spaces on the count sheet.

14
NI
NinaCarter1023

Our last shortage parcel contained the right number of the wrong locating pieces. We caught it at receiving, which was cheaper than finding it at changeover. Can the supplier identify the exact replacement geometry and contents before dispatch?

21
JA
JamieBarnes0556

Nina's point is why I'd keep the original kit reference beside the substitute offer, rather than revise the expected list to match whatever they now have available

-2
AD
AdaBennett0738

Yes. A proposed substitute belongs in its own comparison until tooling accepts it. The receiving list shouldn't make that decision by renaming the missing item.

6
MA
Marcus_Bowen

Tooling found the offered block has a different locating height. We declined it. Seller says the original reference can be supplied separately and has sent its drawing for confirmation.

16
SA
SamBennett0768

Much better to find that on the drawing than under a fixture full of parts. Has the original-reference parcel actually been collected?

10
MA
Marcus_Bowen

Collected, with nine original-reference blocks on the contents list. Our receiving team has the confirmed drawing and the shortage line. Still 197 complete kits until they check it.

19
MA
Marcus_Bowen

Nine blocks received and checked by stores with tooling. Correct reference and locating geometry. All 206 kits are now complete. The shared-block explanation and declined substitute remain in the correspondence, not in our kit definition.

6
NI
NinaCarter1023

Thanks for the final count. Keeping the original expectation intact gave receiving a chance to catch the wrong alternative instead of being told to expect it.

9

讨论已关闭