Our 206 kit order contains 197 locating blocks
Marcus_Bowen · 2026年1月25日 21:46 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
13 条回复
Put the agreed block entry beside the receiving count and nine-block difference, with the invoice unit shown; ask for an answer to that shortage rather than invite a new explanation of the whole order
12分Sent that comparison. Seller has acknowledged the count but says some kits were intended to share blocks. That arrangement appears nowhere in the accepted contents.
20分Ask them to point to the accepted shared-block entry, then; otherwise they're describing a different order after yours arrived short.
24分They cannot identify one and have accepted nine missing blocks. Now offering nine loose replacements with a slightly different reference. I've asked tooling to compare it before agreeing.
6分Don't let getting the quantity right close the suitability question. The replacements still need to make nine usable kits, not just fill nine spaces on the count sheet.
14分Our last shortage parcel contained the right number of the wrong locating pieces. We caught it at receiving, which was cheaper than finding it at changeover. Can the supplier identify the exact replacement geometry and contents before dispatch?
21分Nina's point is why I'd keep the original kit reference beside the substitute offer, rather than revise the expected list to match whatever they now have available
-2分Yes. A proposed substitute belongs in its own comparison until tooling accepts it. The receiving list shouldn't make that decision by renaming the missing item.
6分Tooling found the offered block has a different locating height. We declined it. Seller says the original reference can be supplied separately and has sent its drawing for confirmation.
16分Much better to find that on the drawing than under a fixture full of parts. Has the original-reference parcel actually been collected?
10分Collected, with nine original-reference blocks on the contents list. Our receiving team has the confirmed drawing and the shortage line. Still 197 complete kits until they check it.
19分Nine blocks received and checked by stores with tooling. Correct reference and locating geometry. All 206 kits are now complete. The shared-block explanation and declined substitute remain in the correspondence, not in our kit definition.
6分Thanks for the final count. Keeping the original expectation intact gave receiving a chance to catch the wrong alternative instead of being told to expect it.
9分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .