简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Our UR5e bracket notes call clamping an incoming fit-up check

CarlaAli0227 · 2026年3月30日 22:15 UTC

回复讨论
CA
CarlaAli0227
I know to follow the same feature through the released checks now, but this UR5e teaching example has an earlier muddle: the incoming fit-up box was ticked after the bracket was clamped. The photo shows everything aligned under restraint. That does not tell my learners how it fitted before the clamps pulled it there.

9 条回复

JO
JoFixtures

Ask the author what they actually checked before closing the clamps, because that tick may be a badly named setup check rather than evidence of incoming fit-up.

15
CA
CarlaAli0227
回复 JoFixtures

Author confirms it was a setup check after clamping, not an incoming measurement. I have relabelled it in the lesson and left incoming fit-up unknown for that example.

5
JO
JoFixtures

That keeps the useful observation without inventing an earlier one; have fabrication define the actual incoming and location checks for the current bracket before the fixture designer inherits the same assumption.

18
TO
TobyBrooks0840

Was the fixture assembled to an identified drawing at the time? Stores may have its issue history, but that will not tell you which contacts the operator actually used.

25
CA
CarlaAli0227

Its drawing is identified. The operator remembers adding a loose support during loading, though it is absent from the photograph after clamping. I have passed that detail to tooling, not drawn it in as an approved fixture feature.

19
JO
JoFixtures

Good distinction, and ask tooling to account for the loading support as well as the final clamped state; it may explain how the operator presented the parts without becoming a permanent locating feature.

12
TO
TobyBrooks0840

Has that loose support been found and identified? A remembered block could mean several things in a shared fabrication area.

11
CA
CarlaAli0227

Not found. The current fixture review will observe loading and first released inspection together, with fabrication and quality defining the checks. The old lesson now says exactly which stage was observed and leaves the loose support unidentified.

8
JO
JoFixtures

Keep that uncertainty in the material sent to the fixture designer too, Carla; the lesson can be careful while a separate concept sketch still quietly turns the remembered support into a requirement.

25