Our UR5e bracket notes call clamping an incoming fit-up check

CarlaAli0227 · 30 Mar 2026, 22:15 UTC

Closed
CA
CarlaAli0227
I know to follow the same feature through the released checks now, but this UR5e teaching example has an earlier muddle: the incoming fit-up box was ticked after the bracket was clamped. The photo shows everything aligned under restraint. That does not tell my learners how it fitted before the clamps pulled it there.

9 replies

JO
JoFixtures
Replying to CarlaAli0227

Ask the author what they actually checked before closing the clamps, because that tick may be a badly named setup check rather than evidence of incoming fit-up.

15points
CA
CarlaAli0227
Replying to JoFixtures

Author confirms it was a setup check after clamping, not an incoming measurement. I have relabelled it in the lesson and left incoming fit-up unknown for that example.

5points
JO
JoFixtures
Replying to CarlaAli0227

That keeps the useful observation without inventing an earlier one; have fabrication define the actual incoming and location checks for the current bracket before the fixture designer inherits the same assumption.

18points
TO
TobyBrooks0840
Replying to CarlaAli0227

Was the fixture assembled to an identified drawing at the time? Stores may have its issue history, but that will not tell you which contacts the operator actually used.

25points
CA
CarlaAli0227
Replying to TobyBrooks0840

Its drawing is identified. The operator remembers adding a loose support during loading, though it is absent from the photograph after clamping. I have passed that detail to tooling, not drawn it in as an approved fixture feature.

19points
JO
JoFixtures
Replying to CarlaAli0227

Good distinction, and ask tooling to account for the loading support as well as the final clamped state; it may explain how the operator presented the parts without becoming a permanent locating feature.

12points
TO
TobyBrooks0840
Replying to CarlaAli0227

Has that loose support been found and identified? A remembered block could mean several things in a shared fabrication area.

11points
CA
CarlaAli0227
Replying to TobyBrooks0840

Not found. The current fixture review will observe loading and first released inspection together, with fabrication and quality defining the checks. The old lesson now says exactly which stage was observed and leaves the loose support unidentified.

8points
JO
JoFixtures
Replying to CarlaAli0227

Keep that uncertainty in the material sent to the fixture designer too, Carla; the lesson can be careful while a separate concept sketch still quietly turns the remembered support into a requirement.

25points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .