Missing loose-bracket readings between welding and correction

LeoChen1145 · 2025年7月23日 15:35 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

LE
LeoChen1145
I'm reviewing old gusset-bracket results for a UR5e fixture proposal. The clamped alignment sheet looks good, then the traveller says corrected before final inspection. I need to know what the fixture actually produced before we copy it. No identifiable released readings in this folder.

3 条回复

PR
PriyaCarter1003

Ask the final inspector and whoever did the correction, with the actual traveller beside them. They may know where the missing check lived, or tell you it was never recorded. Either answer is better than treating the final pass as the untouched result.

18分
LE
LeoChen1145

Inspector remembers measuring after correction only. The former setter can explain the extra work but has no individual readings from before it. We're asking welding and quality to define a current-part trial instead of copying the old adjustment.

12分
PR
PriyaCarter1003

Did they agree that trial, Leo? I'd be interested whether it also records the incoming components, so the new fixture doesn't get blamed for variation already present before welding.

24分