Missing loose-bracket readings between welding and correction

LeoChen1145 · 23 Jul 2025, 15:35 UTC

Closed
LE
LeoChen1145
I'm reviewing old gusset-bracket results for a UR5e fixture proposal. The clamped alignment sheet looks good, then the traveller says corrected before final inspection. I need to know what the fixture actually produced before we copy it. No identifiable released readings in this folder.

3 replies

PR
PriyaCarter1003
Replying to LeoChen1145

Ask the final inspector and whoever did the correction, with the actual traveller beside them. They may know where the missing check lived, or tell you it was never recorded. Either answer is better than treating the final pass as the untouched result.

18 points
LE
LeoChen1145
Replying to PriyaCarter1003

Inspector remembers measuring after correction only. The former setter can explain the extra work but has no individual readings from before it. We're asking welding and quality to define a current-part trial instead of copying the old adjustment.

12 points
PR
PriyaCarter1003
Replying to LeoChen1145

Did they agree that trial, Leo? I'd be interested whether it also records the incoming components, so the new fixture doesn't get blamed for variation already present before welding.

24 points