Does each result carry the housing's identity, so the report can count accepted items while retaining all their inspection attempts?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
How do I count accepted housings instead of successful inspection rows?
AmaraBrown0948 · 2025年5月9日 17:38 UTC
15 条回复
Yes. Housing label plus an attempt number.
-2分Then the report can group attempts under the item, but the completion count should use its current reviewed acceptance state rather than the number of pass rows.
11分Who owns that acceptance state? Ours had a pass in one screen and a hold in another. Dispatch naturally chose the happier screen until somebody pointed out the box still had a hold label on it.
9分Quality owns it. Holds are separate in the database, ignored by this report.
10分So the fix needs those decisions too. Developer has the example now.
8分Include a held item with an earlier pass in the check; that will show whether the revised total follows the current decision.
19分Who handles an undecided item when quality has gone home?
4分Will unresolved items have their own visible count, so the shift can see what still needs a decision without opening every housing's history?
17分Yes. Quality's nominated cover handles decisions; unresolved stays separate from accepted.
12分Test report counts the retried housing once. The held-pass example counts zero accepted. All attempts remain visible.
5分Try receiving the same result twice too. Our reconnect replayed the last result and made a second row, which looked wonderfully productive until we counted the parts.
15分Same attempt identifier is now recognised on repeat delivery. A new real attempt still gets its own row.
16分Quality reconciled the revised report with the trays. Counts agree, including holds. Corrected report is in use.
15分Does its heading say accepted housings now? That small wording change would make the number easier to interpret than the old generic completed count.