简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

How do I price 163 cartons without calling every unknown included?

AlistairCampbell · 2026年6月14日 03:38 UTC

回复讨论
AL
AlistairCampbell
FR10 arm price looked manageable. Now fixtures, guarding and training are filling the estimate. Need complete proposals compared while the remaining design costs stay honestly uncertain. Where do I stop the total becoming fiction?

17 条回复

OM
OmarArcher0404

Separate firm prices from allowances and excluded work. Put an owner and the missing information beside each uncertain line, or the smallest-looking total will simply be the least complete.

21
AL
AlistairCampbell

One quote says training included with no scope. Another names two days but excludes staff cover. Our internal sheet treats both as zero extra cost.

6
MA
MayaAli0214

I'd ask who attends and what those days cover, Alistair. Two days with the builder operating the station may be less useful than shorter sessions where both shifts practise the approved changeover and recovery cases.

16
LE
LeahBrooks0843

And include the production time lost while people attend. Training can be included in the invoice and still cost the workshop something.

13
AM
AmaraBarnes0600

Our first estimate also omitted spare presentation fixtures, because everyone pictured the fitted set and nobody pictured a damaged one waiting for repair while the next order arrived.

12
OM
OmarArcher0404

Amara, would you buy a spare set immediately? I'd price availability and replacement lead time before making that another automatic addition to a pilot.

3
AM
AmaraBarnes0600

Not automatically, Omar; I meant expose the cover plan and its cost, which might be a spare, repair arrangement or accepted downtime rather than another complete set on day one.

6
AL
AlistairCampbell

That distinction helps. We're estimating a production cell, but the first order is only 163. I don't want every possible contingency bought immediately or silently left with maintenance.

16
MA
MayaAli0214

For staffing, I'd use the intended order mix rather than only the initial quantity. A single first order can show the task, but it won't represent frequent changeovers if that's what follows.

7
LE
LeahBrooks0843

Does preparation begin from your real incoming cartons? Or have the proposals already unpacked them at no cost?

25
AL
AlistairCampbell

One proposal starts with arranged trays. The other includes presentation fixtures but not who fills them. Neither prices the same incoming condition as our current bench.

6
OM
OmarArcher0404

Then agree that boundary before ranking. You can retain their current totals, but label what each buys instead of pretending the difference is a robot-price saving.

8
AM
AmaraBarnes0600

Leah's preparation question should go to the people doing that work too, because our supplier's allowance looked reasonable until the operator showed how many mixed boxes arrived between changeovers.

5
MA
MayaAli0214

Amara, yes, and estimates from operators can remain estimates with their source stated. They do not need to become invented stopwatch data just because purchasing wants a comparison this week.

10
AL
AlistairCampbell

Rebuilt the comparison around actual incoming cartons and the same output. Internal labour allowances have named sources. Suppliers still owe preparation staffing and training scope, so neither total is final.

8
OM
OmarArcher0404

Has that changed which proposal appears cheaper, Alistair? Interested whether the apparent gap survives once the excluded jobs have names.

13
LE
LeahBrooks0843

Whatever the answer, keep the unresolved lines on the summary page. Otherwise somebody will quote the old arm price and ask why the workshop made it expensive.

7

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。