简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

four-day FR10 housing-unloading report needs a clearer occurrence

MeiBrown0951 · 2026年8月15日 17:05 UTC

回复讨论
ME
MeiBrown0951
This is the running housing unloader in our prototype area, separate from the unfitted-tooling order. Sent its intermittent FR10 stop video to our Alibaba seller four days ago and got a request for more information. What should I collect around an occurrence so the reply can get beyond a general request for another film?

11 条回复

GR
GraceArcher0407

Identify one occurrence with its readable message, active job step, time and preceding actions. Mark anything absent from the film instead of reconstructing it as fact.

19
FA
FarahBaker0504

If you have several record sources, keep their original times and any known clock relationship. A near match is not a guaranteed link, particularly if recording started after the interruption

19
ME
MeiBrown0951

Original film starts late and doesn't show the message. We have two history entries near the operator's recalled time, but I can't choose between them. Kept the files unchanged.

4
LO
LouisAbbott0050

Do not use the more convenient entry as the video's missing message; both remain candidates until the occurrence can be linked

13
SO
SofiaBrown0891

Ask support what capture their technician needs next, with that ambiguity stated.

14
ME
MeiBrown0951

Technician supplied the supported capture instructions. We have briefed the shift lead. No new occurrence yet, and no changes to provoke one. The two original entries remain separate attachments.

-2
GR
GraceArcher0407

Include the fixture arrangement and installed revision with the next record. They determine what the named wait refers to in this application.

8
ME
MeiBrown0951

New occurrence captured with a matching timestamp and readable receiving wait. The technician compared the job revision and asked the receiving fixture owner to check the availability history. That's happening separately from the old ambiguous clip.

21
FA
FarahBaker0504

Has the receiving owner confirmed the interface meaning, or only agreed to inspect it? Those are different answers for the technician

2
ME
MeiBrown0951

Meaning confirmed for this revision; cause still being investigated. The receiving record shows availability absent at that event. It doesn't say why. We now have a joint technical enquiry rather than a proposed replacement part.

8
LO
LouisAbbott0050

Keep the unanswered why attached to the event, and avoid extending that finding to the older stops you could not identify

19

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。